WEBVTT

NOTE The Firm

1
00:00:00.000 --> 00:00:05.000
Okay, we've got a lot to cover. It's getting to the end of the term. I can't believe it.

2
00:00:05.000 --> 00:00:08.000
Anyway, this is the way it is.

3
00:00:08.000 --> 00:00:18.000
Okay, we have dollars, the usual demand curve, which we carried over from the first part of the course.

4
00:00:18.000 --> 00:00:21.000
Price on the y-axis, quantity on the x-axis.

5
00:00:21.000 --> 00:00:27.000
The demand curve is falling. Total revenue can either go up or down, depending on the elasticity.

6
00:00:27.000 --> 00:00:39.000
TR is equal to price times quantity, and the other curve here we have dollars on the y-axis,

7
00:00:39.000 --> 00:00:40.000
quantity on the x-axis.

8
00:00:40.000 --> 00:00:45.160
We now have a TR curve, which can either go up or down, except it obviously can only go

9
00:00:45.160 --> 00:00:48.360
up from the point of origin, since it starts at zero.

10
00:00:48.360 --> 00:00:56.120
If you produce and sell zero TV sets, like I sell no TV sets, and therefore my total

11
00:00:56.120 --> 00:00:58.560
Total revenue from selling TV sets is zero.

12
00:00:58.560 --> 00:01:04.240
We start at the point of origin, zero quantity, zero total revenue, and a total revenue curve

13
00:01:04.240 --> 00:01:08.960
then has to go up from zero, and goes up, and then either goes up or down, except we're

14
00:01:08.960 --> 00:01:16.200
in some kind of peak trough situation, to the extent that it goes up, the demand curve

15
00:01:16.200 --> 00:01:17.200
is elastic.

16
00:01:17.200 --> 00:01:25.080
In other words, this is the area when the total revenue is increasing as quantity increases,

17
00:01:25.080 --> 00:01:40.080
This is the definition of the man curve being elastic, in other words, as quantity increases, like so, and total revenue is going up, this means that the man curve is elastic in that zone.

18
00:01:40.080 --> 00:01:43.080
So this is elastic the man curve.

19
00:01:43.080 --> 00:01:53.080
Then as it goes down, the definition of that is that the man curve is inelastic, in other words, as the quantity goes up, we now get into a situation where total revenue declines.

20
00:01:53.080 --> 00:02:08.080
And so, let's say here, as the state total revenue is now less, so in that situation we have an inelastic demand curve, and that goes up again, elastic, and then inelastic.

21
00:02:08.080 --> 00:02:14.080
So in the textbook, as I mentioned last time, all these problems are resolved because there's just one peak.

22
00:02:14.080 --> 00:02:20.080
In other words, the total revenue curve is drawn like this, and so in that situation it's very easy.

23
00:02:20.080 --> 00:02:33.080
If it's elastic here, then it becomes inelastic, but it doesn't have to be only one peak, it could be several peaks, so I'm drawing it this way to show that in real life it can be multi-peak.

24
00:02:33.080 --> 00:02:43.080
Okay, so you have the total revenue curve, which goes like that, meaning you don't know whether it's going up or down at any given moment.

25
00:02:43.080 --> 00:02:44.080
It could be either way.

26
00:02:44.080 --> 00:02:50.680
The total cost curve, which I went through last time, is always going up.

27
00:02:50.680 --> 00:02:55.880
Total cost curve starts off at zero, the point of origin, regardless of what the book says.

28
00:02:55.880 --> 00:03:02.880
In other words, if I am producing no TV sets, I produce no TV sets, I sell no TV sets, therefore

29
00:03:02.880 --> 00:03:06.980
my cost incurred in producing TV sets is zero.

30
00:03:06.980 --> 00:03:08.920
I start at the point of origin.

31
00:03:08.920 --> 00:03:10.520
All the rest of the stuff is purely short run.

32
00:03:10.520 --> 00:03:16.880
In other words, if I happen to be on a motorola producing TV and I'm retooling for six months

33
00:03:16.880 --> 00:03:19.800
because the TV sets aren't selling, I might be having fixed costs, because there really

34
00:03:19.800 --> 00:03:23.840
are no fixed costs in these sort of long run sets, okay?

35
00:03:23.840 --> 00:03:24.840
Yeah?

36
00:03:24.840 --> 00:03:31.160
Well, not if you're not in the business, I mean, you don't have to be in, nobody's compelling

37
00:03:31.160 --> 00:03:33.680
you to be in the business of selling TV sets, okay?

38
00:03:33.680 --> 00:03:39.560
In other words, I'm not, obviously in some short run situations, before you're, as you're

39
00:03:39.560 --> 00:03:43.120
You're gearing up, you have costs and then you have revenue.

40
00:03:43.120 --> 00:03:46.160
But there's nothing to compel you in the long run to stay in business if you're not selling

41
00:03:46.160 --> 00:03:47.160
anything.

42
00:03:47.160 --> 00:03:50.280
The point is that there are no fixed costs after a short run.

43
00:03:50.280 --> 00:03:54.880
There are short run fixed costs, but there are no real fixed costs in any real philosophic

44
00:03:54.880 --> 00:03:56.360
sense so to speak.

45
00:03:56.360 --> 00:04:03.560
Also, the variability of the costs are varied for any given unit, any given plant.

46
00:04:03.560 --> 00:04:07.360
Plants are more or less fixed, machines are less fixed, et cetera, et cetera.

47
00:04:07.360 --> 00:04:12.700
So, there are different divisibilities. I'll get into that later on today. But the point

48
00:04:12.700 --> 00:04:18.880
is there are no fixed costs. Nothing is fixed. If you're losing money in this business, you

49
00:04:18.880 --> 00:04:23.160
get the hell out, you sell the plant, you close down, you sell the plant, you sell it

50
00:04:23.160 --> 00:04:29.000
for scrap if necessary. You're firing somebody, you stop, you break your lease, you leave,

51
00:04:29.000 --> 00:04:33.400
or you transfer the lease to somebody else, and then you get out. So, so-called fixity

52
00:04:33.400 --> 00:04:42.040
is only very short run. There's nothing imposed upon you by the divine commandment that some

53
00:04:42.040 --> 00:04:45.040
things are fixed and other things are variable. Everything is variable at the point in time.

54
00:04:45.040 --> 00:04:50.560
All costs are variable at different degrees. Some costs are easier to get rid of than others.

55
00:04:50.560 --> 00:04:56.200
For example, if you're in the TV business and you decide to get out, you can immediately

56
00:04:56.200 --> 00:05:20.500
The aim of every firm is to maximize its profits or to minimize its losses, and therefore they're

57
00:05:20.500 --> 00:05:24.100
trying to get in a situation where there's the biggest distance between total revenue

58
00:05:24.100 --> 00:05:54.100
to maximize PR minus PC or profits. If there are luck holes in a good shape, this will be positive. In some cases, it can be negative. In some cases, you might have this kind of a situation. A total cost curve like that and a total revenue curve like that, then you're in really bad shape. Whatever you do, you're going to lose money. Eventually, of course, you go out of business. You raise tuition.

59
00:05:54.100 --> 00:05:57.100
That's not a market activity.

60
00:05:57.100 --> 00:06:03.660
So anyway, the maximum profit point of production you try to produce so that you maximize your

61
00:06:03.660 --> 00:06:07.980
profit, the maximum profit, one of the attributes of maximum profit point of production is that

62
00:06:07.980 --> 00:06:13.340
the slope of the tangent of total revenue and total cost are the same.

63
00:06:13.340 --> 00:06:21.180
So that if the slope of the tangent of TR and TC are the same, then you've got marginal

64
00:06:21.180 --> 00:06:32.740
Marginal revenue is equal to marginal cost. Marginal revenue is defined as delta TR over

65
00:06:32.740 --> 00:06:39.260
delta Q. In other words, if you produce one more item, one more TV set, one more package

66
00:06:39.260 --> 00:06:43.060
of nails, whatever you're selling, produce one more item. How much more total revenue

67
00:06:43.060 --> 00:06:48.740
will be brought in by that one more item? That's essentially the slope of the tangent.

68
00:06:48.740 --> 00:06:57.820
If you have an infinitesimal degree, the delta becomes infinitesimal and becomes dT or dQ.

69
00:06:57.820 --> 00:07:04.060
Marginal cost is also, the reason why I prefer to stick to delta is that in real life, nothing

70
00:07:04.060 --> 00:07:05.060
is infinitesimal.

71
00:07:05.060 --> 00:07:10.100
In human action, buying or selling or producing, it's not infinitesimally small, infinitesimally

72
00:07:10.100 --> 00:07:11.100
small.

73
00:07:11.100 --> 00:07:12.900
This is dTc over dQ.

74
00:07:12.900 --> 00:07:18.940
So, in other words, if you produce and sell one more unit of the item, how much will this

75
00:07:18.940 --> 00:07:20.900
extra unit cost you?

76
00:07:20.900 --> 00:07:25.100
And so, the maximum profit point is when the two are more or less equal, when the delta,

77
00:07:25.100 --> 00:07:27.380
the marginal revenue and marginal cost are equal.

78
00:07:27.380 --> 00:07:32.980
Now the thing is we should not make too much of this because once you realize there can

79
00:07:32.980 --> 00:07:37.500
be more than one peak, as the textbooks never realize, then you can also have a minimal

80
00:07:37.500 --> 00:07:38.500
profit.

81
00:07:38.500 --> 00:07:42.420
Profit. It could be in this situation, the tangents are equal here, the slope of the

82
00:07:42.420 --> 00:07:48.740
tangent is equal and yet you're in very bad shape. Also equal up here, you don't know

83
00:07:48.740 --> 00:07:54.380
off-hand which is bigger, this or that, unless you actually inspect the data and find out.

84
00:07:54.380 --> 00:07:59.300
So the marginal revenue equal marginal cost criterion is a very weak one. It only applies

85
00:07:59.300 --> 00:08:06.060
if you have only one peak. And it's better if you have the data, if you're a businessman,

86
00:08:06.060 --> 00:08:09.740
It's much better to figure out what the total is and not worry about the margin.

87
00:08:09.740 --> 00:08:13.020
Really the only important thing about the margin is that it emphasizes the fact that

88
00:08:13.020 --> 00:08:17.380
every step that a businessman takes, every decision a businessman takes, every new unit

89
00:08:17.380 --> 00:08:20.660
that he produces, he has to worry about covering costs.

90
00:08:20.660 --> 00:08:24.940
He has to figure he's not going to do it unless at least he covers costs, his revenue and

91
00:08:24.940 --> 00:08:26.580
costs are equal for this decision.

92
00:08:26.580 --> 00:08:29.900
Hopefully the cost is greater and the revenue is greater than the cost.

93
00:08:29.900 --> 00:08:34.820
That's the major, philosophically important, so to speak, of concentrating on the margin.

94
00:08:34.820 --> 00:08:39.820
The rest of it is mostly overblown, and the importance is really overblown of this.

95
00:08:39.820 --> 00:08:48.820
Okay, average, average revenue is TR over Q.

96
00:08:48.820 --> 00:08:53.820
In other words, if you want to find out, if you're producing, you sell, if you're producing, sell 100 units of something,

97
00:08:53.820 --> 00:08:57.820
100 packages of Wheaties or 100 loaves of bread or whatever, what's your average revenue?

98
00:08:57.820 --> 00:09:02.820
It's going to be the total you get, total income divided by the quantity.

99
00:09:02.820 --> 00:09:08.100
and the income per loaf of bread or income per TV set, which of course is the same thing

100
00:09:08.100 --> 00:09:09.100
as the price.

101
00:09:09.100 --> 00:09:12.860
In other words, T times Q is equal to TR.

102
00:09:12.860 --> 00:09:19.220
So average revenue is the same thing as price, it's another name for price of something.

103
00:09:19.220 --> 00:09:24.540
If somebody sells ten loaves of Wonder Bread and gets ten bucks for it, it means the price

104
00:09:24.540 --> 00:09:29.020
of the Wonder Bread, the average revenue of the Wonder Bread is a dollar per loaf.

105
00:09:29.020 --> 00:09:40.020
So this is our old friend the demand curve. This is the demand curve, the price curve so to speak, relating price and quantity.

106
00:09:40.020 --> 00:09:49.020
Marginal revenue, I mean average cost, is equal to total cost per unit, total cost divided by Q.

107
00:09:49.020 --> 00:09:55.020
Also you can call it average total cost to clearly distinguish, we're not talking about average fixed cost, average variable, all this sort of nonsense.

108
00:09:55.020 --> 00:09:58.020
I will not talk about fixing variable costs from now on.

109
00:09:58.020 --> 00:10:03.020
When I talk about average cost, it's average total cost, average cost, total cost per unit.

110
00:10:03.020 --> 00:10:10.020
It costs you $100,000 to produce and sell 10,000 items, and therefore the cost per item is 10 bucks.

111
00:10:10.020 --> 00:10:13.020
That sort of thing.

112
00:10:13.020 --> 00:10:16.020
Okay, now the relationship between marginal and average.

113
00:10:16.020 --> 00:10:20.020
There's a certain relationship between all margins and all averages, and we'll get to that later.

114
00:10:20.020 --> 00:10:24.020
We'll get to the labor market and the factory production market, too.

115
00:10:24.020 --> 00:10:31.020
It's a purely mathematical relationship. It has nothing to do with economics, but it's used in economics, so we should go through it.

116
00:10:31.020 --> 00:10:35.020
The relationship is as follows.

117
00:10:35.020 --> 00:10:39.020
Supposing, for example, we take the average height of this class.

118
00:10:39.020 --> 00:10:44.020
Each of us has a certain height. We total all the heights, and we divide it by whatever it is.

119
00:10:44.020 --> 00:10:47.020
It's 20 people, and we get the average height.

120
00:10:47.020 --> 00:10:51.020
Two basketball players walk in, and seven footers.

121
00:10:51.020 --> 00:11:00.020
Then we take another average and of course it's going to pull up the average, not as much as 7 feet, but it's going to pull it up from whatever it is, 5'8 or whatever it is, to 5'9 or something.

122
00:11:00.020 --> 00:11:26.020
In other words, if an average, if an average of x is increasing, then the marginal x is higher than the average, the average of x.

123
00:11:26.020 --> 00:11:31.140
In other words, if you see an average going, if an average is increasing, like the average

124
00:11:31.140 --> 00:11:36.660
height of a class increases from now to a half hour from now, it means a new guy coming

125
00:11:36.660 --> 00:11:40.220
in, new people coming in, are higher than the average.

126
00:11:40.220 --> 00:11:41.220
That's why the average is going up.

127
00:11:41.220 --> 00:11:45.380
In other words, the increased margin pulls the average up.

128
00:11:45.380 --> 00:11:50.060
So if you have an average of anything, it's not just the height, it applies to anything.

129
00:11:50.060 --> 00:11:55.820
Average income, average weight, average whatever, intelligence quotient, whatever happens to

130
00:11:55.820 --> 00:12:05.820
If the average is going up, that means that the marginal of the thing, average of x, the marginal of x is higher than the average, whatever it is.

131
00:12:05.820 --> 00:12:17.820
On the other hand, the same thing applies to the other direction. All these laws are symmetrical.

132
00:12:17.820 --> 00:12:24.820
If we take the average height and two midgets walk in, two four-footers, it's going to pull down the average.

133
00:12:24.820 --> 00:12:40.580
If the average of something is decreasing, then the marginal of x is less than the average

134
00:12:40.580 --> 00:12:41.580
of x.

135
00:12:41.580 --> 00:12:54.380
So, in other words, if you see an average of something decreasing, it means that the

136
00:12:54.380 --> 00:13:01.380
The margin is pulling down the average. These two midgets or three midgets, whatever it is, are pulling down the class average in height.

137
00:13:01.380 --> 00:13:05.380
So, this is the other law. It's symmetrical to the first one.

138
00:13:05.380 --> 00:13:10.380
So that means if you have an average of anything as decreasing, it means that the margin is below the average.

139
00:13:10.380 --> 00:13:18.380
Here we have an average of something. It doesn't matter what it is. Let's say height. It doesn't matter.

140
00:13:18.380 --> 00:13:27.380
And this average is going up, so it means that the margin is above it somewhere, and if the average is going down, it means the margin is below it somewhere.

141
00:13:27.380 --> 00:13:30.380
The margin is the average.

142
00:13:30.380 --> 00:13:42.380
Well, okay, if in that case, this is pretty obvious, but in that case it means that when the average reaches a peak, it reaches a peak point, which means it's constant for that moment, of course.

143
00:13:42.380 --> 00:13:50.380
And the average utility, it must mean that the marginal is equal to the average, it's the only way you can cut through, you can't leap across the dimension here.

144
00:13:50.380 --> 00:13:56.380
So it must mean that at the point where the average flattens out before it falls, the marginal is equal to it.

145
00:13:56.380 --> 00:14:04.380
In other words, this follows from these two points, these two axioms here, whatever you want to call them, propositions.

146
00:14:04.380 --> 00:14:17.220
So, therefore, when the average of x is at a peak, in other words, when it's constant,

147
00:14:17.220 --> 00:14:22.820
then the average of x is equal to the marginal of x.

148
00:14:22.820 --> 00:14:24.900
And also it works for the trough point.

149
00:14:24.900 --> 00:14:32.700
In other words, the average is going down, the average is something, and then it goes

150
00:14:32.700 --> 00:14:36.500
When it goes up and it goes down, the margin is below it somewhere, the marginals, when

151
00:14:36.500 --> 00:14:40.840
the average is going up, the marginals above it, the average.

152
00:14:40.840 --> 00:14:45.100
This means that when the average flattens out and becomes a trough of the trough point,

153
00:14:45.100 --> 00:14:47.980
the marginals must be equal to it.

154
00:14:47.980 --> 00:14:57.180
So this is, okay, so when the A of X is either a P or a trough, because at a peak or a trough,

155
00:14:57.180 --> 00:15:01.060
the average is constant for that moment.

156
00:15:01.060 --> 00:15:04.820
and the average of x is equal to the margin.

157
00:15:04.820 --> 00:15:06.860
This applies to all averages and all marginals.

158
00:15:06.860 --> 00:15:10.940
FAT-MAC applies to everything in life, just in economics we just build a few things here,

159
00:15:10.940 --> 00:15:12.540
but you can carry it over to all of life now.

160
00:15:12.540 --> 00:15:18.340
You have this great piece of knowledge which can serve you in good stead forever in all

161
00:15:18.340 --> 00:15:23.500
fields of endeavor, height, weight, IQ test or whatever.

162
00:15:23.500 --> 00:15:34.700
In the case of microeconomics, the average costs, as we'll see in a minute, average

163
00:15:34.700 --> 00:15:39.020
costs tend to have a U-shape, something like that, you'll see why, average total cost

164
00:15:39.020 --> 00:15:43.020
or average cost.

165
00:15:43.020 --> 00:15:44.020
Something like that.

166
00:15:44.020 --> 00:15:47.180
In other words, it declines, reaches a throw-off point, and then goes up.

167
00:15:47.180 --> 00:15:52.780
This is dollars on the y-axis, quantity of goods on the x-axis.

168
00:15:52.780 --> 00:16:02.780
We haven't demonstrated this yet. I will demonstrate this a little later. If it has this kind of a U-shape, then marginal cost will always be below it when it's declining.

169
00:16:02.780 --> 00:16:11.780
It will always be above it when it's going up, because it follows. When the average of anything falls, the marginal is below it, below the average.

170
00:16:11.780 --> 00:16:14.780
When the average of anything is going up, the marginal has to be above the average.

171
00:16:14.780 --> 00:16:18.780
When the average of anything is at a trough point, the marginal is equal to it.

172
00:16:18.780 --> 00:16:24.080
So, therefore, marginal costs, if the average costs really have some kind of a U-shape,

173
00:16:24.080 --> 00:16:28.140
kind of shape, then the marginal costs will be something like that and they will equal

174
00:16:28.140 --> 00:16:36.820
each other at the trough point.

175
00:16:36.820 --> 00:16:48.020
For revenue, it's a little bit different because since the demand curve is always falling,

176
00:16:48.020 --> 00:16:52.020
The man is equal to average revenue, so the average revenue is always falling.

177
00:16:52.020 --> 00:16:55.020
This is a rising average revenue curve.

178
00:16:55.020 --> 00:17:00.020
So the marginal revenue will always be below it.

179
00:17:00.020 --> 00:17:02.020
In other words, this average revenue is always falling.

180
00:17:02.020 --> 00:17:04.020
This means the marginal revenue is always below it.

181
00:17:04.020 --> 00:17:07.020
It will be like this, matter of fact.

182
00:17:07.020 --> 00:17:10.020
Eventually it will hit the x-axis for that matter.

183
00:17:10.020 --> 00:17:12.020
It will keep going like that.

184
00:17:12.020 --> 00:17:16.020
So this accounts for the shape of the marginal curve in the book.

185
00:17:16.020 --> 00:17:20.660
In other words, given the average curve, because the man curve is always falling, as I've said

186
00:17:20.660 --> 00:17:24.460
to that, the marginal curve is always falling, it will always be below it and will actually

187
00:17:24.460 --> 00:17:28.900
fall more steeply, you could say that, and if the average curve is U-shaped, and I haven't

188
00:17:28.900 --> 00:17:32.940
demonstrated that yet, then the marginal curve will be something like that, hitting, intersecting

189
00:17:32.940 --> 00:17:34.540
at the trough point.

190
00:17:34.540 --> 00:17:41.300
So this is all really mathematics, it's now applied to microeconomics, and later on we'll

191
00:17:41.300 --> 00:17:45.300
Let's see how this applies to productivity curves, things like that.

192
00:17:45.300 --> 00:17:49.300
Okay, let's get to the average cost curve, then,

193
00:17:49.300 --> 00:17:53.300
why a few shake or whatever. When you think of economy

194
00:17:53.300 --> 00:17:57.300
of large-scale production, those of you who have walked with the idea of a total cost curve

195
00:17:57.300 --> 00:18:01.300
is always going up, and you say, no, no, but total cost, how about a normal meal plan, isn't it less

196
00:18:01.300 --> 00:18:05.300
costly to have a large-scale production? It's true, but for average cost that you're talking

197
00:18:05.300 --> 00:18:09.300
about, average total cost.

198
00:18:09.300 --> 00:18:14.460
Let's look at the average course curve, it's not as simple as you might think, why it's

199
00:18:14.460 --> 00:18:15.460
something like U-shape.

200
00:18:15.460 --> 00:18:24.220
Now we get to some more philosophic mathematics, so to speak, this is philosophy of life of

201
00:18:24.220 --> 00:18:27.380
mathematics applied to it.

202
00:18:27.380 --> 00:18:33.620
We have it in real life, so to speak, law of cause and effect, which essentially says

203
00:18:33.620 --> 00:18:48.620
given the causal factors, given a certain quantity of causal factors, it will yield a certain result, a certain effect, and this cause and effect relationship can be replicated at any time or place.

204
00:18:48.620 --> 00:18:59.620
In other words, you can set side by side, you can produce whatever it is, you can produce copper sulfate in a certain way, you can produce the same copper sulfate next week or two blocks away and so forth and so on.

205
00:18:59.620 --> 00:19:09.620
So this is a basic law of life, that equal causes yield equal effects, that they have a natural law situation, called natural law of nature, natural law situation.

206
00:19:09.620 --> 00:19:22.620
Okay, we can express this, we can express this natural law situation in production by a mathematical formula, by a generalized mathematical formula called the production function.

207
00:19:22.620 --> 00:19:28.060
It's a very general law, but it expresses certain basic truths.

208
00:19:28.060 --> 00:19:34.060
When a production function says it relates, it says as follows, given, it applies to all

209
00:19:34.060 --> 00:19:35.060
production of anything.

210
00:19:35.060 --> 00:19:39.300
It really applies to any kind of action for that matter, any kind of quantitative action

211
00:19:39.300 --> 00:19:40.300
of any sort.

212
00:19:40.300 --> 00:19:42.460
I mean, to buy a sandwich, you have to do certain things.

213
00:19:42.460 --> 00:19:43.460
You have to go downstairs.

214
00:19:43.460 --> 00:19:44.460
You have to go to Michelangelo's.

215
00:19:44.460 --> 00:19:46.460
They've got the sandwich and all that sort of thing.

216
00:19:46.460 --> 00:19:48.660
You pay a certain amount of money, you leave that out.

217
00:19:48.660 --> 00:19:51.660
It's a physical production function.

218
00:19:51.660 --> 00:19:57.460
What you're saying is this, to produce anything, you need certain end factors of production,

219
00:19:57.460 --> 00:20:00.660
you need a certain amount of labor, land, capital, certain types and so forth and so

220
00:20:00.660 --> 00:20:01.660
on.

221
00:20:01.660 --> 00:20:07.340
A certain quantity of each factor, a factor x, a certain quantity alpha, whatever the

222
00:20:07.340 --> 00:20:14.260
quantity is, five of it, three of it, it will differ from good to good, it depends on each

223
00:20:14.260 --> 00:20:16.780
good and service, it depends on the technology of it.

224
00:20:16.780 --> 00:20:33.460
The alpha of x, combined with, this is a symbol for combined with, combined with beta, a certain

225
00:20:33.460 --> 00:20:41.180
quantity of y, factor y, combined with a certain gamma, a certain quantity of factor z, combined

226
00:20:41.180 --> 00:20:48.180
Combine with a bunch of other factors, dot dot dot, will yield a certain quantity of

227
00:20:48.180 --> 00:20:50.500
a product.

228
00:20:50.500 --> 00:20:55.740
Q of, I don't know, what's, Q of P?

229
00:20:55.740 --> 00:21:01.740
P is usually price, let's make it R. Q of R, Q of a certain product.

230
00:21:01.740 --> 00:21:07.900
In other words, you take a certain number, a certain amount of factor of X, combine it

231
00:21:07.900 --> 00:21:20.900
In a certain way, with a certain amount of factor Y combined with a certain amount of factor Z, step by step you will get five eggs or three TV sets or whatever it happens to be. You get a certain quantity of a product.

232
00:21:20.900 --> 00:21:28.900
This applies to any product of any sort. It doesn't matter what the actual service happens to be.

233
00:21:28.900 --> 00:21:35.900
This is a generalized production function. Since you have a law of cause and effect, you can replicate it. You can put it side by side somewhere and duplicate it.

234
00:21:35.900 --> 00:21:46.040
So you'll have then alpha of x combined with beta of y combined with gamma of z, etc.

235
00:21:46.040 --> 00:21:51.460
Side by side will produce another q of r, another three t v sets or another 28 loaves

236
00:21:51.460 --> 00:21:53.260
of wonder bread, whatever it happens to be.

237
00:21:53.260 --> 00:21:56.900
So this means that you can keep adding indefinitely.

238
00:21:56.900 --> 00:22:00.420
So therefore, instead of doing that, of course, you can multiply each of these factors by

239
00:22:00.420 --> 00:22:01.420
n.

240
00:22:01.420 --> 00:22:08.420
So this means that n times alpha, minus n times beta, minus n times gamma will yield n times the product.

241
00:22:08.420 --> 00:22:12.420
This is purely, this follows the law of cause and effect.

242
00:22:14.420 --> 00:22:19.420
So this is our generalized production function. Those of you who are mathematical mavens,

243
00:22:19.420 --> 00:22:22.420
this is also called a linear homogeneous production function.

244
00:22:22.420 --> 00:22:26.420
Don't ask me what this means, because I'll just state it.

245
00:22:31.420 --> 00:22:40.420
So, this means that from the physical point of view, just from the point of view of physical product, physical factors or whatever,

246
00:22:40.420 --> 00:22:49.420
if you're a business firm now, to get back to the firm, and you're hiring factors and you're producing certain things and getting the product,

247
00:22:49.420 --> 00:22:54.420
this means that the average cost of everything should be constant.

248
00:22:54.420 --> 00:23:11.420
should be constant. In other words, if to produce, I don't know, produce 100 loaves of wonder bread, you need alphas or whatever, to produce a thousand, you need 10 times as much, and we've just said this through our basic law of linear homogeneous production sponge.

249
00:23:11.420 --> 00:23:26.420
So this means that the average therefore cost, this is dollars, means you need five times as much of everything to produce five times of a product, so therefore it should mean that the average cost is horizontal.

250
00:23:26.420 --> 00:23:30.420
The average total cost would be horizontal.

251
00:23:30.420 --> 00:23:34.420
And since it's obviously not horizontal, the question is how come?

252
00:23:34.420 --> 00:23:41.140
come. Here we have a real problem. It obviously does not cost. If you want to produce one

253
00:23:41.140 --> 00:23:46.380
car a year, you're not going to build a $100 million automobile plant with all the equipment

254
00:23:46.380 --> 00:23:50.320
and grind out with one car because you have an astronomical cost per car. You have a huge

255
00:23:50.320 --> 00:23:55.900
fixed cost in situations like that. One thing that violates, by the way, of course, is when

256
00:23:55.900 --> 00:24:01.980
the price goes up, as we'll see later on, even more. If you keep producing more and

257
00:24:01.980 --> 00:24:06.300
If you're going to buy more of this thing, grinding out many n's, in other words, losing

258
00:24:06.300 --> 00:24:09.780
ten loads of money, about ten cars, a hundred, a thousand, a million, you're going to start

259
00:24:09.780 --> 00:24:15.060
bidding up the demand curves of the various factors of labor, in other words, you're buying

260
00:24:15.060 --> 00:24:20.100
more, demanding more labor on raw materials or land, you're going to bid the prices up,

261
00:24:20.100 --> 00:24:24.900
so the wage rates and raw material prices and all those things will go up.

262
00:24:24.900 --> 00:24:30.400
So eventually, even if everything was constant, because of the prices going up, the price

263
00:24:30.400 --> 00:24:41.400
The price of the factors of production, the cost from the point of view of price, in other words, the price of labor, the price of land, low material, you'll have something like that, so you'll have an average cost that will then go up.

264
00:24:41.400 --> 00:24:49.400
But the real problem is what about the sloping cost, which we know, we know of course that the average cost falls over a long distance when you start producing.

265
00:24:49.400 --> 00:24:52.400
So the question is, where does that come from? Why does it have a falling average cost fair?

266
00:24:52.400 --> 00:24:59.400
Why is it more economic to have a huge assembly line for automobiles producing a million cars a year instead of five cars a year?

267
00:24:59.400 --> 00:25:08.120
Cards a year. Why is it much costlier to have a small automobile plant? And we haven't explained

268
00:25:08.120 --> 00:25:13.240
that yet. So in other words, with the philosophy, we have the constant average cost curve, and

269
00:25:13.240 --> 00:25:18.360
then knowing that an increase in demand curve will raise the price of raw materials and

270
00:25:18.360 --> 00:25:23.240
labor etc., we're going to explain the average cost curve going up at the toe of the end.

271
00:25:23.240 --> 00:25:28.240
What we can't explain yet is why it falls on the early parts of production.

272
00:25:33.240 --> 00:25:40.240
The reason why it falls, allegedly violating all of this law of linear homogeneous production factor, doesn't really violate it.

273
00:25:40.240 --> 00:25:45.240
The problem is, you can't multiply everything by n in real life. That's the problem.

274
00:25:45.240 --> 00:25:49.240
In other words, you can't take n times nq.

275
00:25:49.240 --> 00:25:56.240
You can't multiply each thing by n, because each factor of production is a different divisibility.

276
00:25:56.240 --> 00:25:59.240
This is the so-called indivisibility problem.

277
00:25:59.240 --> 00:26:05.240
You can, for example, multiply paperclips by n.

278
00:26:05.240 --> 00:26:10.240
If you're increasing the production of something by tenfold, you're going to have ten times as many paperclips.

279
00:26:10.240 --> 00:26:11.240
There's no problem with that.

280
00:26:11.240 --> 00:26:16.240
Or ten times as many nails, or something like that, which are very divisible.

281
00:26:16.240 --> 00:26:20.360
In other words, some factors of production, some capital goods are very divisible, others

282
00:26:20.360 --> 00:26:23.400
are very indivisible, just the nature, the technological nature of them is very indivisible.

283
00:26:23.400 --> 00:26:26.080
You can't multiply a plant by a factory by ten, right?

284
00:26:26.080 --> 00:26:31.560
You can have ten times as many machines, maybe, but you can't have ten times as many factories.

285
00:26:31.560 --> 00:26:36.720
The most, the famous case of a very indivisible, there are different degrees of indivisibility.

286
00:26:36.720 --> 00:26:39.680
This is why I'm getting back to this gentleman's point about fixed costs.

287
00:26:39.680 --> 00:26:42.800
There are different degrees of fixity, there are different degrees of variability.

288
00:26:42.800 --> 00:26:47.120
The problem with the textbook they say some costs are fixed and others are variable. Everything

289
00:26:47.120 --> 00:26:52.800
is variable but at different degrees. For example, the most famous case of a very indivisible

290
00:26:52.800 --> 00:26:57.400
capital good is a railroad track. Let's say you have a railroad going from here to Boston

291
00:26:57.400 --> 00:27:01.120
and you're increasing, you're doubling the amount of shipments on it because you have

292
00:27:01.120 --> 00:27:05.320
more business. Well, you can double the number of railroad cars maybe. You can double the

293
00:27:05.320 --> 00:27:08.720
number of railroad workers and engineers and firemen and stuff. You can't double the track.

294
00:27:08.720 --> 00:27:15.720
The track, the double track is a big thing, a big deal. It takes a long time. You have to lay the track and all the rest of it. It's not very easy.

295
00:27:15.720 --> 00:27:22.720
You have different degrees of indivisibility. Railroad track is one of the least indivisible things I can think of, one of the most indivisible things.

296
00:27:22.720 --> 00:27:29.720
Factories are quite indivisible. Machines are less indivisible than different machines.

297
00:27:29.720 --> 00:27:35.720
Law material is very divisible, you can get more, you know, law material coming through pretty easily.

298
00:27:35.720 --> 00:27:38.720
Labor has different degrees of divisibility, et cetera, et cetera.

299
00:27:38.720 --> 00:27:41.720
And some things like paper clips are very divisible.

300
00:27:41.720 --> 00:27:45.720
So, in practice, you can't increase everything by n.

301
00:27:45.720 --> 00:27:47.720
Some things can be doubled, other things can't.

302
00:27:47.720 --> 00:27:49.720
Some things can be tripled easily.

303
00:27:49.720 --> 00:27:52.720
You can quadruple, say, this before you can double this.

304
00:27:52.720 --> 00:27:55.720
And so, it's because of that, because of these degrees of indivisibility,

305
00:27:55.720 --> 00:28:04.800
In other words, you start with a plant. Let's say you're producing automobile. You start

306
00:28:04.800 --> 00:28:09.920
with a huge plant with a big equipment and all the rest of the stuff before you can produce

307
00:28:09.920 --> 00:28:15.440
anything. You produce one car a year. You've got an enormous $100 million per car cost

308
00:28:15.440 --> 00:28:19.040
because you have this enormous cost in order to gear up those things because these are

309
00:28:19.040 --> 00:28:23.840
all very indivisible. You have a stratospheric average cost problem. As you keep increasing

310
00:28:23.840 --> 00:28:32.300
In other words, then you begin to have very rapidly decreasing as you start using this

311
00:28:32.300 --> 00:28:33.300
very indivisible machine.

312
00:28:33.300 --> 00:28:34.300
It's like a big computer.

313
00:28:34.300 --> 00:28:37.900
You have a huge mainframe computer, like in the old days, think you have to use it a lot

314
00:28:37.900 --> 00:28:41.880
to make it efficient, bring down like average cost per unit.

315
00:28:41.880 --> 00:28:48.600
As you increase the units of production, you have a very rapid fall in average cost as

316
00:28:48.600 --> 00:28:52.160
you keep tapping more and more of the indivisibility, you start using this very indivisible, it's

317
00:28:52.160 --> 00:28:59.320
It's like picking a $100 million machine or whatever and using it only once a year, one

318
00:28:59.320 --> 00:29:00.320
hour a year.

319
00:29:00.320 --> 00:29:01.320
It's crazy.

320
00:29:01.320 --> 00:29:03.800
It's a very high average cost per unit.

321
00:29:03.800 --> 00:29:08.360
As you keep using it, you lower the invisibility and as you keep increasing the quantity, more

322
00:29:08.360 --> 00:29:09.680
and more of the invisibility are tapped.

323
00:29:09.680 --> 00:29:13.280
In other words, you're using it in more and more capacity production.

324
00:29:13.280 --> 00:29:18.760
As you do that, you finally level it off and you finally begin to use it at capacity.

325
00:29:18.760 --> 00:29:21.920
Most entrepreneurs, when they're building a plant, are thinking of a certain range of

326
00:29:21.920 --> 00:29:25.600
production they're going to use it, you know, a hundred million cars a year or something.

327
00:29:25.600 --> 00:29:28.840
They will design a plant in such a way that it will be the most efficient or lowest average

328
00:29:28.840 --> 00:29:30.400
cost, more or less at a million a year.

329
00:29:30.400 --> 00:29:34.240
I mean, this would be a certain range, because it's not God-given, it's going to be the

330
00:29:34.240 --> 00:29:39.120
same number of cars for ten years or twenty years, but more or less they know the range.

331
00:29:39.120 --> 00:29:40.920
Nobody thinks of producing one car a year.

332
00:29:40.920 --> 00:29:46.280
When the automobile industry first started, they grew up in blacksmith shops around 1900,

333
00:29:46.280 --> 00:29:48.680
small blacksmith shops, bicycle shops.

334
00:29:48.680 --> 00:29:51.520
They produced one car a year or ten cars a year or something like that.

335
00:29:51.520 --> 00:29:52.520
They were geared for it.

336
00:29:52.520 --> 00:29:53.520
That was the most efficient.

337
00:29:53.520 --> 00:29:57.400
The lowest average cost is more or less at ten cars a year, but after they start going

338
00:29:57.400 --> 00:30:01.840
into mass production, the whole thing changes.

339
00:30:01.840 --> 00:30:05.240
So as you keep increasing the quantity, you finally get to the point where you're more

340
00:30:05.240 --> 00:30:08.200
or less using everything in capacity and you start overusing things.

341
00:30:08.200 --> 00:30:11.440
And as you keep going, you start overusing various products.

342
00:30:11.440 --> 00:30:14.280
You can't gear it in such a way that everything meshes together at once.

343
00:30:14.280 --> 00:30:18.320
So as you keep increasing the quantity, you start having problems with overuse, breakdowns

344
00:30:18.320 --> 00:30:24.060
of Equipment, and the average costs begin to turn up.

345
00:30:24.060 --> 00:30:29.740
And then you have, finally, as you get big mass production, the factor enters in of increasing

346
00:30:29.740 --> 00:30:34.260
the price of wages and more material, in other words, you have an average cost turning up

347
00:30:34.260 --> 00:30:37.540
because the price of the factors of production goes up.

348
00:30:37.540 --> 00:30:42.100
As a result of all this, you have something like a U-shaped average cost curve.

349
00:30:42.100 --> 00:30:44.900
Because of the problem of indivisibility, you have to get to the point where you're

350
00:30:44.900 --> 00:30:48.780
using up the indivisibility, you're tapping the, you know, using the capacity of all this

351
00:30:48.780 --> 00:30:49.780
fixed equipment.

352
00:30:49.780 --> 00:30:53.660
But there are different degrees of indivisibility, it's not just some things are fixed and other

353
00:30:53.660 --> 00:30:54.660
things are variable.

354
00:30:54.660 --> 00:31:00.900
Everything is variable except at different paces, at different rates, and so the best

355
00:31:00.900 --> 00:31:02.860
way to mesh them together is somewhere around here.

356
00:31:02.860 --> 00:31:07.340
It's still not totally meshed together because life doesn't work that way.

357
00:31:07.340 --> 00:31:11.580
So you have something like a U-shaped average cost curve, that's the final conclusion,

358
00:31:11.580 --> 00:31:17.500
And more or less, you hear it, of course you're usually operating around here, in this area.

359
00:31:17.500 --> 00:31:22.520
And if you talk to a business man, if an economist talks to a business man about their falling

360
00:31:22.520 --> 00:31:25.420
average cost, they don't usually know what you're talking about because they don't think

361
00:31:25.420 --> 00:31:29.660
in terms of producing one car a year, or two cars a year, obviously they're thinking in

362
00:31:29.660 --> 00:31:35.140
terms of producing a million or so, they're not geared in these kinds of hypothetical

363
00:31:35.140 --> 00:31:36.140
situations.

364
00:31:36.140 --> 00:31:39.780
So most businessmen think, of course, average cost is more or less constant because they're

365
00:31:39.780 --> 00:31:43.420
We're dealing in a zone here, more or less in this area.

366
00:31:43.420 --> 00:31:51.380
As a matter of fact, probably empirically, in most situations, the average cross-curve,

367
00:31:51.380 --> 00:31:54.180
there's nothing that says it has to be U-shaped.

368
00:31:54.180 --> 00:31:59.700
All we know is it starts off very high, it declines, it reaches a cross-point and then

369
00:31:59.700 --> 00:32:00.700
goes up again.

370
00:32:00.700 --> 00:32:05.300
And so usually empirically, it's generally something like this, goes down like this and

371
00:32:05.300 --> 00:32:08.580
there's a plateau and then it goes up.

372
00:32:08.580 --> 00:32:13.480
So most businessmen think of their average cost as constant, because they're dealing

373
00:32:13.480 --> 00:32:16.460
of course in practical reality in this plateau area.

374
00:32:16.460 --> 00:32:21.680
They don't deal in the areas where they start having big increases in costs or areas where

375
00:32:21.680 --> 00:32:23.820
they're only producing five cars a year or something.

376
00:32:23.820 --> 00:32:28.420
So more or less you have this plateau situation.

377
00:32:28.420 --> 00:32:32.980
And in this situation of course marginal cost will be somewhere below it.

378
00:32:32.980 --> 00:32:36.940
When average costs are falling, marginal costs are below it, usually around here somewhere

379
00:32:36.940 --> 00:32:46.940
marginal cost will be higher here, and of course it will intersect at the trough point

380
00:32:46.940 --> 00:32:51.940
and again, too much is made of this in a textbook, I think this is a great thing to worry about the intersection

381
00:32:51.940 --> 00:32:57.940
but basically the point is that marginal costs are set once you give an average cost

382
00:32:57.940 --> 00:33:02.940
and in this situation here, where there's a plateau, marginal cost will be identical to average cost in this whole range

383
00:33:02.940 --> 00:33:08.940
You have something like that, marginal cost like this, up like that, like that.

384
00:33:08.940 --> 00:33:13.940
So, this is why most businessmen, if they talk about marginal cost and average cost at all, which they usually don't,

385
00:33:13.940 --> 00:33:19.940
they say, well, it's all constant, it's all equal, and it is for them, and in the zone of practicality, it is equal.

386
00:33:19.940 --> 00:33:26.940
I mean, because this is the region they're dealing with 99% of the time.

387
00:33:26.940 --> 00:33:34.740
Okay, so this is the, this is basically the average cost, marginal cost, shtick.

388
00:33:34.740 --> 00:33:39.740
It's of some use, certainly, the idea of indivisibility is important.

389
00:33:39.740 --> 00:33:44.620
The average cost curve falling and then being constant and then going up again.

390
00:33:44.620 --> 00:33:50.100
And the idea of marginality is important as an idea of focusing on the fact that businessmen

391
00:33:50.100 --> 00:33:51.100
are interested in each decision.

392
00:33:51.100 --> 00:33:55.220
They want to make a profit on each decision, or at least not make losses on any given decision

393
00:33:55.220 --> 00:34:02.820
in their making during the course of the year.

394
00:34:02.820 --> 00:34:12.740
Now we take the maximum profit point, or the maximum profit diagram, remember in our total

395
00:34:12.740 --> 00:34:22.500
curve, where the total revenue is like that, and the total cost is like that, this is the

396
00:34:22.500 --> 00:34:23.500
maximum profit.

397
00:34:23.500 --> 00:34:31.500
In other words, businessmen, if they know the curves, which is a very big if, will tend to produce at this point, where the profit is at the maximum.

398
00:34:31.500 --> 00:34:40.500
Transposing that to the average marginal curve, we have then the demand curve is like this, let's say.

399
00:34:40.500 --> 00:34:42.500
Something like that.

400
00:34:42.500 --> 00:34:46.500
And here's the average cost curve and then whatever.

401
00:34:46.500 --> 00:34:51.500
And in this case, the marginal revenue curve would be like this.

402
00:34:51.500 --> 00:34:59.780
and marginal cost curve will come up like that and remember that given the various assumptions,

403
00:34:59.780 --> 00:35:05.580
given a one peak curve, okay, beginning about multi-peaks, given a one peak curve, and given

404
00:35:05.580 --> 00:35:09.380
this diagram, you can't automatically see what the maximum profit point is, you can in

405
00:35:09.380 --> 00:35:14.620
this diagram, pretty obvious, you know, this is the maximum profit point, given only this

406
00:35:14.620 --> 00:35:17.860
diagram, the only way you can figure out the maximum profit point is by taking marginal

407
00:35:17.860 --> 00:35:21.460
Marginal Revenue Equal Marginal Cost is the criterion, in other words, this point right

408
00:35:21.460 --> 00:35:23.360
here.

409
00:35:23.360 --> 00:35:28.740
This will be the point of maximum profit for the firm given these curves, given the situation.

410
00:35:28.740 --> 00:35:36.100
At this point, this point of production, let's say, this is a thousand widgets or whatever,

411
00:35:36.100 --> 00:35:40.060
at that point, this is where marginal revenue and marginal cost are equal, the only point

412
00:35:40.060 --> 00:35:47.180
where they're equal, at that point the total profit will be the following.

413
00:35:47.180 --> 00:36:03.620
Total Profit, it will be average revenue times Q, or price times Q, total revenue, minus,

414
00:36:03.620 --> 00:36:13.260
So this is, if you're looking at the averages, total revenue minus total cost, so this is

415
00:36:13.260 --> 00:36:24.100
total revenue is average revenue, average revenue times quantity minus average cost

416
00:36:24.100 --> 00:36:25.100
times quantity.

417
00:36:25.100 --> 00:36:30.820
So this is the way, this is the way total, this would be maximum profit point, where

418
00:36:30.820 --> 00:36:35.620
Now, it was at the point where marginal revenue and marginal cost are equal, average revenue

419
00:36:35.620 --> 00:36:41.220
times quantity, the total profit will be average revenue times quantity minus average cost

420
00:36:41.220 --> 00:36:42.220
times quantity.

421
00:36:42.220 --> 00:36:50.620
In other words, this is average revenue times quantity here, this figure, minus average

422
00:36:50.620 --> 00:36:52.260
cost down here times quantity.

423
00:36:52.260 --> 00:37:03.140
So this, the total profit will be this area here, in other words average revenue minus

424
00:37:03.140 --> 00:37:11.640
average cost times quantity, this will give you the total profit at the maximum profit

425
00:37:11.640 --> 00:37:12.640
point.

426
00:37:12.640 --> 00:37:17.740
In other words, at the point where marginal revenue and marginal cost are equal, you then

427
00:37:17.740 --> 00:37:24.220
take this, this minus this, this is on the point-of-demand curve, minus the point-of-the-total

428
00:37:24.220 --> 00:37:28.740
on the average cost curve, times quantity, giving you this area, this will be the same

429
00:37:28.740 --> 00:37:30.940
as that, as this line here.

430
00:37:30.940 --> 00:37:35.460
And this is a big, this is always big in the textbook, always giving you these examples

431
00:37:35.460 --> 00:37:41.940
of problems except for finding the maximum profit point, let's grind it out that way.

432
00:37:41.940 --> 00:37:46.460
In real life, of course, this is average to the total, why not go for the total, why worry

433
00:37:46.460 --> 00:37:47.460
about the average?

434
00:37:47.460 --> 00:37:50.820
This is the way it's done on the books.

435
00:37:50.820 --> 00:37:56.960
Given only this information, the maximum profit will be the point where these marginal revenue

436
00:37:56.960 --> 00:38:03.020
and marginal costs intersect, and at that point, the total profit will be this area.

437
00:38:03.020 --> 00:38:11.620
Of course, if you're making losses, then you're in an unfortunate situation, such as as follows.

438
00:38:11.620 --> 00:38:16.380
Here's the demand curve, and here's the average cost, and you're always below it,

439
00:38:16.380 --> 00:38:20.380
and you're in bad shape.

440
00:38:20.380 --> 00:38:24.380
This, I guess, will be the marginal cost

441
00:38:24.380 --> 00:38:28.380
coming up like that, the marginal revenue. This will be like the minimum

442
00:38:28.380 --> 00:38:32.380
loss point here. So you produce at this level, this will be the loss.

443
00:38:32.380 --> 00:38:36.380
Of course, if you keep on like this, you go out of business

444
00:38:36.380 --> 00:38:40.380
pretty quickly. I'm not going to hang around and make losses forever, but this

445
00:38:40.380 --> 00:38:44.380
would be the minimum loss point. This would be the area of loss then.

446
00:38:44.380 --> 00:38:51.580
textbook, at the point of intersection, marginal revenue and marginal cost, this would be the

447
00:38:51.580 --> 00:38:56.900
minimum loss point where the average cost minus average revenue times quantities at

448
00:38:56.900 --> 00:38:57.900
a minimum.

449
00:38:57.900 --> 00:39:02.700
Hopefully, of course, usually in the textbook, this is the example because you're assuming

450
00:39:02.700 --> 00:39:04.060
the firm is making a profit.

451
00:39:04.060 --> 00:39:07.340
It doesn't have to make a profit, nothing, there's no divine law, it doesn't have to

452
00:39:07.340 --> 00:39:08.340
make a profit.

453
00:39:08.340 --> 00:39:14.700
So, anyway, this is essentially production. The theory of production of the firm is essentially

454
00:39:14.700 --> 00:39:19.460
this, that the firm tries to make a maximum profit. A maximum profit is determined in

455
00:39:19.460 --> 00:39:27.420
a one peak curve situation, one peak total revenue curve, and be at a point where the

456
00:39:27.420 --> 00:39:30.860
slope of the tangents, in other words, marginal revenue and marginal cost are equal. So the

457
00:39:30.860 --> 00:39:37.700
marginal revenue and cost and marginal cost curves intersect, and at that curve, you can

458
00:39:37.700 --> 00:39:43.700
This line here in the total diagram is very simple. This is obviously much simpler.

459
00:39:43.700 --> 00:39:47.700
Just look at this. This is the profit, total profit, this minus that.

460
00:39:47.700 --> 00:39:57.700
In this curve it's more complicated. The area is subtract average revenue, average cost of average revenue multiplied by quantity, and that gives you the total profit.

461
00:39:57.700 --> 00:40:01.700
Any questions on this?

462
00:40:01.700 --> 00:40:07.700
This is the high-powered stuff of the month, yeah.

463
00:40:07.700 --> 00:40:18.700
Given that you're operating altogether, as I say, you can see that for a certain wide you go out of business, this would be the minimum loss area.

464
00:40:18.700 --> 00:40:30.700
All of this is loss because average cost is always above average revenue in this particular diagram, so this is the minimal point, given that you're operating at all.

465
00:40:30.700 --> 00:41:00.700
So, and given a one peak curve, a one peak total revenue curve, if it's two peaks then all the bets are off, you have to look for the, you know, you have to look for the expected total, but as I say in the textbook they never talk about two peaks because that screws up the whole math and the whole geometry of it screwed up. You can't rely on tangents and all the rest of the things. Okay, let's take a ten minute break and get on the applications here of this analysis, maximum profits thing.

466
00:41:00.700 --> 00:41:09.820
Supposing you're a business firm, you're here, you're producing this much, you're

467
00:41:09.820 --> 00:41:16.780
in the inelastic demand curve zone, in other words, okay, so you're in this kind of a

468
00:41:16.780 --> 00:41:23.460
situation, price and quantity, so that means that you're in a situation where you cut

469
00:41:23.460 --> 00:41:29.740
your production, let's say this is 1500 units, you cut your production from 1500 to less

470
00:41:29.740 --> 00:41:41.600
The total revenue goes up because you're in an elastic demand curve for the firm.

471
00:41:41.600 --> 00:41:42.600
Therefore you will do it.

472
00:41:42.600 --> 00:41:46.980
If a business man has any smarts at all, he will get the hell out of this situation because

473
00:41:46.980 --> 00:41:48.140
all he has to do is to cut production.

474
00:41:48.140 --> 00:41:52.140
When he cuts production, the total cost goes down, the total revenue goes up and he automatically

475
00:41:52.140 --> 00:41:54.740
makes more money.

476
00:41:54.740 --> 00:41:59.340
For a no-business firm which has any smarts at all will ever remain in this zone.

477
00:41:59.340 --> 00:42:05.340
In other words, it will always be in this zone here, even if it doesn't quite hit the

478
00:42:05.340 --> 00:42:10.020
maximum profit point, which is difficult to do, because you don't always know what your

479
00:42:10.020 --> 00:42:15.060
demand curve is and what your cost curve is, if you see it all, all you have to do is to

480
00:42:15.060 --> 00:42:19.180
cut costs and your total revenue goes up, you will do it.

481
00:42:19.180 --> 00:42:24.420
So the conclusion is that every firm, every business firm will always be, will always produce

482
00:42:24.420 --> 00:42:26.940
in an area where the demand curve is elastic.

483
00:42:26.940 --> 00:42:33.620
In other words, this area here, this is the rising total revenue curve, the elastic demand

484
00:42:33.620 --> 00:42:36.620
curve zone.

485
00:42:36.620 --> 00:42:40.020
So that means every firm will have an elastic demand curve, because if they're in an elastic

486
00:42:40.020 --> 00:42:42.060
zone, they'll get out of it, they'll cut production quickly.

487
00:42:42.060 --> 00:42:44.820
The reason why they'll cut production is not to increase it, because it's very easy to

488
00:42:44.820 --> 00:42:45.820
cut production.

489
00:42:45.820 --> 00:42:50.820
If you cut production, the costs are lower and your total revenue is up, you will do it.

490
00:42:50.820 --> 00:42:55.820
So, this area is not viable. No firm will be in it.

491
00:42:55.820 --> 00:43:01.820
We have a very important conclusion here. The conclusion is that every firm will have an elastic demand curve.

492
00:43:01.820 --> 00:43:06.820
It will be in an area where the demand curve is elastic.

493
00:43:06.820 --> 00:43:12.820
We've already seen that the demand curve for the firm is more elastic than the demand curve for the industry as a whole.

494
00:43:12.820 --> 00:43:16.620
because you have more range of choice for the consumer, Wonder Bread, Pepperidge Farm,

495
00:43:16.620 --> 00:43:19.700
whatever, there's much more range of choice than bread, period.

496
00:43:19.700 --> 00:43:21.340
But now we see more than that.

497
00:43:21.340 --> 00:43:25.060
Not only will the man curve for the firm be more elastic than the man curve for the industry,

498
00:43:25.060 --> 00:43:26.060
it will be elastic, period.

499
00:43:26.060 --> 00:43:32.500
In other words, we'll be in a zone where if you increase production, cut prices, the total

500
00:43:32.500 --> 00:43:36.700
revenue goes up, you raise prices, the total revenue will fall, the firm will always be

501
00:43:36.700 --> 00:43:37.700
in this zone.

502
00:43:37.700 --> 00:43:40.980
Because if the firm is in this zone, we're talking about a firm now, not an industry.

503
00:43:40.980 --> 00:43:45.580
The firm will never be in this zone because it will always be immediately profitable to

504
00:43:45.580 --> 00:43:49.500
cut production, cut costs and raise revenue.

505
00:43:49.500 --> 00:43:53.120
No firm will, given any smarts at all, get me in a situation where I'm losing money by

506
00:43:53.120 --> 00:43:54.660
producing more.

507
00:43:54.660 --> 00:44:01.740
So every firm will have an elastic demand curve.

508
00:44:01.740 --> 00:44:09.620
Now this really covers the theory of costs and demand.

509
00:44:09.620 --> 00:44:14.180
We now get to the whole area of monopoly and competition, and the, I'm going to say it's

510
00:44:14.180 --> 00:44:18.100
going to be much shorter than the stuff in the book, we have to deal with some case studies

511
00:44:18.100 --> 00:44:26.300
of course, but basically, the problem with textbook microeconomics is in the 1930s they

512
00:44:26.300 --> 00:44:32.700
erected a so-called ideal, which they've been getting away from ever since, I mean the micro

513
00:44:32.700 --> 00:44:35.700
texts are much better now than they were 50 years ago, they still have not thrown over

514
00:44:35.700 --> 00:45:04.700
According to the theory of so-called perfect or pure competition, notice the name is perfect

515
00:45:04.700 --> 00:45:10.580
Perfect and Pure, a value-loaded terminology, although the economists claim to be value-free

516
00:45:10.580 --> 00:45:13.320
and non-emotive.

517
00:45:13.320 --> 00:45:14.320
Perfect sounds good.

518
00:45:14.320 --> 00:45:19.700
If you say a situation is perfect or pure, it implies that it's a good situation.

519
00:45:19.700 --> 00:45:24.040
It's better to be perfect than imperfect, it's better to be pure than impure.

520
00:45:24.040 --> 00:45:29.140
Perfect competition or pure competition is defined as a situation where the man care

521
00:45:29.140 --> 00:45:36.820
Whether the man curve for the firm is horizontal.

522
00:45:36.820 --> 00:45:41.460
Instead of being simply elastic, whether the man curve for the firm is perfectly elastic

523
00:45:41.460 --> 00:45:46.220
or infinitely elastic, that's supposed to be the best situation.

524
00:45:46.220 --> 00:45:49.220
Why it's the best, we'll go into a little later.

525
00:45:49.220 --> 00:45:54.660
To say it's unrealistic is putting it mildly, because it never exists.

526
00:45:54.660 --> 00:45:59.980
What it implies is that, regardless of how much the firm produces, it won't have to

527
00:45:59.980 --> 00:46:00.980
cut price.

528
00:46:00.980 --> 00:46:02.740
We've already seen the mangroves are always falling.

529
00:46:02.740 --> 00:46:04.420
How can it be horizontal?

530
00:46:04.420 --> 00:46:09.460
The theory is, it's true that the mangrove of the industry is falling, but if each firm

531
00:46:09.460 --> 00:46:15.380
is very, very tiny, say the wheat market is a classification of a big wheat industry,

532
00:46:15.380 --> 00:46:20.260
each farm is only 100 acres or 10 acres, if Hiram Jones, wheat farmer in Iowa, increases

533
00:46:20.260 --> 00:46:23.580
the production by 10%, it's not going to affect the entire wheat market.

534
00:46:23.580 --> 00:46:29.980
On that basis, they claim that the demand curve for each farmer is horizontal, and that's

535
00:46:29.980 --> 00:46:30.980
certainly elastic.

536
00:46:30.980 --> 00:46:35.260
It's not really, because obviously, the angel Gabriel came to Hiram Jones and said, look,

537
00:46:35.260 --> 00:46:38.780
I can magically increase your production by a million fold, it will affect his demand

538
00:46:38.780 --> 00:46:39.780
curve.

539
00:46:39.780 --> 00:46:42.420
I mean, he'll have to cut the price in order to sell it.

540
00:46:42.420 --> 00:46:46.660
As a given production, it's very tiny compared to the rest of the industry, does not improve

541
00:46:46.660 --> 00:46:52.020
a product, as a product is fixed forever, doesn't compete in any other spectacular way.

542
00:46:52.020 --> 00:46:56.020
In that situation, the man curve would almost look like it's infinitely horizontal.

543
00:46:56.020 --> 00:46:57.020
Why is that better?

544
00:46:57.020 --> 00:46:58.020
Who knows?

545
00:46:58.020 --> 00:47:00.940
There's certain alleged reasons for it that I think are all phony, but anyway, this is

546
00:47:00.940 --> 00:47:06.340
supposed to be the ideal situation, a situation where competition is perfect.

547
00:47:06.340 --> 00:47:07.340
Anything else?

548
00:47:07.340 --> 00:47:11.580
In other words, in real life, where all the man curves are falling, even for Hiram Jones,

549
00:47:11.580 --> 00:47:16.460
certainly for everybody else, every other firm, because if the firm increases, if it

550
00:47:16.460 --> 00:47:20.860
doubles its production, it'll have to cut the price in order to sell it, it faces a

551
00:47:20.860 --> 00:47:30.220
All real life situations are attacked as being, quote, imperfect or impure or monopolistic.

552
00:47:30.220 --> 00:47:37.020
So the theory of monopoly we've inherited from the 1930s is this very weird theory where

553
00:47:37.020 --> 00:47:41.780
the only real competition, the only perfect competition, is when each firm faces a horizontal

554
00:47:41.780 --> 00:47:45.300
man curve, it says each firm a reality, including ourselves.

555
00:47:45.300 --> 00:47:49.540
I mean, if you go in there, if you become an engineer and you charge your wage rate

556
00:47:49.540 --> 00:47:57.540
You will face a falling demand curve. In other words, if you insist on tripling your salary, you're going to get a much lower demand for your services.

557
00:47:57.540 --> 00:48:03.540
So everybody is a, quote, monopolist in that sense, or monopolistic. All life is monopolistic.

558
00:48:03.540 --> 00:48:10.540
It's a very peculiar kind of terminology, you see, where everybody becomes a monopolist by definition.

559
00:48:10.540 --> 00:48:17.540
So real life, when every firm or every individual or whatever faces a falling demand curve, it's called monopolistic, imperfect and pure.

560
00:48:17.540 --> 00:48:22.540
Perfect and Pure. Notice, these economists claim to be value-free. They're scientists.

561
00:48:22.540 --> 00:48:26.220
They're not passing moral judgments. But look at the moral judgment that's implicit in this.

562
00:48:26.220 --> 00:48:31.860
On one hand, you have perfect and pure and, quote, competitive. And on the other hand,

563
00:48:31.860 --> 00:48:37.700
you have imperfect, impure, and monopolistic. Obviously, value-loaded terminology. Attacking

564
00:48:37.700 --> 00:48:46.220
this as being somehow evil. And the antitrust system, from the 1930s until about 20 years

565
00:48:46.220 --> 00:48:52.300
was designed to try to force industry into this percussive bed of being pure, perfect,

566
00:48:52.300 --> 00:48:54.020
and where every firm faces a horizontal macro.

567
00:48:54.020 --> 00:48:57.220
Remember, it's a break-up industry, you have tiny little firms.

568
00:48:57.220 --> 00:49:04.660
At any rate, this is, say the least, not only is it unrealistic, there's no reason to consider

569
00:49:04.660 --> 00:49:05.660
this is better.

570
00:49:05.660 --> 00:49:09.740
Matter of fact, it's worse to have pure competition than have so-called impure because the situation

571
00:49:09.740 --> 00:49:13.940
every firm faces is so tiny, it's going to be almost horizontal macro, it's going to

572
00:49:13.940 --> 00:49:21.940
I mean, one where every firm is so small, you're not going to tap economies of large-scale production. It would be very costly for the consumer and for everybody else.

573
00:49:21.940 --> 00:49:29.940
But anyway, that's the whole schtick. The whole theory of monopoly is, and all the other terms, oligopoly, monopoly, imperfect, it's all the same thing.

574
00:49:29.940 --> 00:49:33.940
It all means that a firm is facing a falling demand curve.

575
00:49:33.940 --> 00:49:39.940
And notice what's happened here. What's happened here is that originally the terms of monopoly and competition, both in economics and in real life,

576
00:49:39.940 --> 00:49:46.140
were defined very differently up until 30 years ago, 50 years ago. Competition meant

577
00:49:46.140 --> 00:49:51.060
rivalry, it meant people competing for business services, it meant other people, other firms

578
00:49:51.060 --> 00:49:55.640
coming in and competing, or other people coming in. That's what competition meant. Monopoly

579
00:49:55.640 --> 00:50:01.900
meant government grants of exclusive privilege to one or more firms. As I've already talked

580
00:50:01.900 --> 00:50:07.220
about, I'll talk more about now, when the government says only the yellow cap company,

581
00:50:07.220 --> 00:50:23.540
The government grants exclusive privileges to one person or few people or whatever, keeping

582
00:50:23.540 --> 00:50:25.020
out all other competitors.

583
00:50:25.020 --> 00:50:26.020
That's monopoly.

584
00:50:26.020 --> 00:50:30.540
That's what monopoly has always meant, until 50 years ago.

585
00:50:30.540 --> 00:50:33.660
Then the economists come along and they change the definition, and everybody's against monopoly

586
00:50:33.660 --> 00:50:34.660
for good reasons.

587
00:50:34.660 --> 00:50:45.660
Because monopoly means, first of all, you're screwing the consumer, you're taking, you're restricting entry into a firm, into a taxi industry or the medical profession or whatever,

588
00:50:45.660 --> 00:50:50.660
and you're deliberately then, by restricting entry, you're raising the price that the consumer has to pay and cutting the production.

589
00:50:50.660 --> 00:50:57.660
And naturally, consumers are against it if they know what's going on, and competitors are against it. Those are excluded from this global racket.

590
00:50:57.660 --> 00:51:08.660
And so the American Revolution, for example, is a revolution against monopolies, against the British East India Tea Company, given the monopoly of import of tea into the United States.

591
00:51:08.660 --> 00:51:20.660
So, and most of the early state governments had a constitutional clause in the state constitution against monopolies, and that didn't mean facing a falling demand curve.

592
00:51:20.660 --> 00:51:25.500
The Falling Demand Curve, it meant that the government may not grant exclusive privileges

593
00:51:25.500 --> 00:51:31.060
to produce or sell any particular product, they can't say only three guys can produce

594
00:51:31.060 --> 00:51:37.700
salt or whatever, so this is for good reason why most of the people are against monopoly

595
00:51:37.700 --> 00:51:40.460
and then what these people, the economists did was they changed the definition of the

596
00:51:40.460 --> 00:51:46.380
term monopoly to mean not grant a privilege by the government but facing a falling demand

597
00:51:46.380 --> 00:51:50.020
curve which everybody faces, it means everybody is an evil monopolist you see and this changes

598
00:51:50.020 --> 00:51:52.940
is the whole meaning of the discussion.

599
00:51:52.940 --> 00:51:56.660
Competition became not competing for products

600
00:51:56.660 --> 00:51:59.100
or making better products or making it cheaper or whatever.

601
00:51:59.100 --> 00:52:01.460
Competition meant a horizontal man curve.

602
00:52:01.460 --> 00:52:03.740
It meant not being able to affect your price

603
00:52:03.740 --> 00:52:04.980
regardless of how much production you make.

604
00:52:04.980 --> 00:52:06.580
It's very weird, and yet this conquer

605
00:52:06.580 --> 00:52:08.940
of the economics profession, at the same time

606
00:52:08.940 --> 00:52:11.220
when Keynesianism and macroeconomics also conquered it,

607
00:52:11.220 --> 00:52:13.700
and it took about 50 years to get rid of Keynesianism

608
00:52:13.700 --> 00:52:16.300
or to roll it back, it's taken about the same amount

609
00:52:16.300 --> 00:52:19.060
of time to roll back the perfect competition doctrine.

610
00:52:19.060 --> 00:52:22.960
It's been rolled back a lot in the last fifty years, but not enough, of course.

611
00:52:22.960 --> 00:52:25.840
Anyway, I'll now hand out the papers, the exams,

612
00:52:25.840 --> 00:52:27.220
shift to that.

613
00:52:27.220 --> 00:52:29.500
You all did spectacularly well, almost too well.
